solutions / for your practice

for your practice

Legal CRM for Construction Lawyers

A construction practice tracks a genuinely wide cast of parties, owners, contractors, subcontractors, sureties, on projects that run for years, with lien deadlines that are unforgiving and disputes that can surface at any point in a build. Generic case software rarely respects any of that.

Let me be honest about what makes construction law genuinely different, right, a single project can involve a genuinely large cast of parties, the owner, the general contractor, several subcontractors, a surety, sometimes an architect or engineer with their own separate liability exposure, and disputes can surface at any point across a project that might run for years, a payment dispute mid-build, a defect claim discovered after completion, a delay claim that only becomes clear once the schedule has already slipped. On top of that, lien rights carry some of the strictest, most unforgiving deadlines in all of civil practice, often measured in days rather than weeks, and missing one can mean a contractor or subcontractor permanently loses the right to secure payment through a lien.

A lot of general practice management software treats every matter identically regardless of how many parties are actually involved or how unforgiving a specific deadline actually is, and that gap shows up fastest in construction work specifically, where a firm needs to track relationships between many parties and hit deadlines measured in days, not months. We built the construction side of Casely around that exact combination, a genuinely wide cast of parties clearly labeled, lien deadlines that cannot slip, and billing that flexes between transactional contract work and contested litigation.

3K+
attorneys running their firm on Casely
15M+
billable hours tracked
98%
customer satisfaction

A deadline diary for lien rights measured in days, not months

Lien filing deadlines are among the most unforgiving in civil practice, often measured in a matter of days from a specific triggering event, and missing one is not a minor scheduling slip, it can mean a contractor or subcontractor permanently loses the ability to secure payment for work already performed.

  1. 01Work performed or materials supplied
  2. 02Notice of intent, if required
  3. 03Lien filed within the statutory window
  4. 04Foreclosure action, if payment is not resolved
  5. 05Resolution, payment, or release of lien

Casely's deadline diary attaches specific dates to any matter with next-date auto-tracking, so a lien filing deadline surfaces on the relevant list well ahead of the tight statutory window, visible to the whole team, not dependent on one paralegal catching a payment dispute the moment it happens and immediately calculating a jurisdiction-specific deadline correctly under real time pressure.

Every party on a project, clearly labeled and easy to find

A construction dispute genuinely involves more parties than most other kinds of matters, an owner, a general contractor, multiple subcontractors, a surety, and losing track of who is who across a project's genuinely long life is a real, recurring headache for a firm handling this kind of work.

  • Does every party's specific role show clearly on the case file
  • Can staff see, at a glance, which parties are involved in a given project dispute
  • Does the deadline diary surface a lien filing window well ahead of the tight statutory deadline
  • Can related matters for the same project be linked together

Contact labels in Casely let staff tag exactly what role each party plays on a given matter, the owner, the general contractor, a specific subcontractor, the surety, so anyone opening the file can see instantly who is who and how to reach them, without digging through months of project correspondence to reconstruct the relationships.

Connected matters for a project that generates multiple disputes

A single construction project can generate more than one dispute over its life, a payment issue mid-build, a separate defect claim discovered after completion, and a firm needs to see how those disputes relate to the same underlying project without losing track of the fact that they are, ultimately, connected.

FeatureCaselySpreadsheet or memory
Lien deadline tracking, measured in daysYes, with next-date auto-trackingManual calendar entries, easy to miss
Party roles labeled clearly per matterYes, per-contact labelsInformal notes, easy to mix up
Connected matters for the same projectYes, explicitly linkedScattered across separate files
Flat-fee and hourly billing handled nativelyYes, both supportedForced into one rigid model

Connected matters in Casely let a firm link related disputes for the same project together, with the relationship stated plainly, so the full history of a project's legal issues is visible on any one file within it, useful context when a later dispute might reasonably reference facts or documents already established in an earlier one. That connection matters especially on a large, multi-year build where the same general contractor or subcontractor might resurface across several separate disputes over the life of the project, and a firm that can see that full pattern at a glance is better equipped to advise the client with genuine context rather than treating each new dispute as an isolated, unrelated event.

Billing that flexes between contract work and litigation

Construction billing genuinely does not look like one thing, contract drafting and review is often flat-fee, while a payment dispute or defect litigation runs hourly against a retainer, and a firm needs billing that moves naturally between those models depending on what a specific matter actually requires.

One click from unbilled time to a finished invoice Turning a matter's billed time into an invoice is a one click action from the billing screen in Casely, pulling every unbilled hour into a single itemized draft, whether that matter has been a quiet contract review or an active litigation dispute running for months against a tight lien-related timeline.

Documents that stay organized across a genuinely long project

A construction file accumulates a genuinely large volume of documents over a project's life, contracts, change orders, correspondence, inspection reports, and losing track of which version of a document is current is a real risk once a project has generated months or years of paperwork.

AES-256
encryption on every document, per-firm key
1-click
converts a matter's unbilled time into an invoice
0
extra logins needed for e-signatures

Every document in Casely carries a comment field that records what changed and why when it gets updated, so the file itself tells the story of the project's legal history, useful when a dispute years later hinges on exactly what a specific change order said or when a particular notice was sent.

A stage tracker that matches how a construction dispute unfolds

A construction dispute moves through a genuinely recognizable arc, notice, an attempt at resolution, escalation to a lien or claim, and either settlement or litigation, and Casely's matter stage tracker ships with a sensible default a firm can adapt to reflect exactly how these disputes typically move in its own jurisdiction.

A firm owner can rename, reorder, add, or remove stages until the tracker matches exactly how the practice handles a dispute, whether that means separate stages for a mandatory pre-litigation negotiation period required in some jurisdictions, or a more direct path to a lien filing, so what is shown on the file reflects the real status of that specific dispute, not a generic status field that does not capture the industry's own procedural rhythm.

Referral relationships with contractors and sureties

A meaningful share of construction work arrives through referrals, insurance brokers, sureties, other attorneys handling adjacent real estate or corporate work who send construction-specific disputes to a specialist, and a firm needs to track those relationships as carefully as it tracks the projects themselves.

Contact labels in Casely let a firm mark a referral source directly on a client's contact record, with notes carrying the actual relationship, so a referring broker or surety stays visible on the file rather than buried in a side spreadsheet nobody updates once the person who built it moves on to other work, which matters over the long run since a small number of strong industry relationships often account for a steady, recurring stream of new construction matters.

Trust accounting when a firm holds funds in an escrow-like role

Some construction matters involve the firm holding funds in trust as part of resolving a payment dispute, a disputed retainage amount, funds pending resolution of a claim, and getting that disbursement math wrong carries the same real consequences as any other trust accounting error, even in a practice area not always thought of as trust-heavy.

Casely blocks any disbursement from exceeding what is actually sitting in that matter's trust balance, enforced at the database transaction level, and every entry stays on the ledger permanently, so if a dispute over how funds were distributed ever comes up months later, the complete honest history is right there to pull up rather than reconstructed from memory under pressure.

Getting a construction practice live

For a firm running an active construction practice, whether transactional, litigation-focused, or a genuine mix of both, Casely setup is realistic within a day or two, matters, contacts and any open retainer balances import cleanly, and the deadline diary comes with sensible defaults a firm can tighten further for its own jurisdiction's specific lien statutes. Larger practices with years of complex, multi-party project histories worth mapping properly and carefully should plan a short parallel-run week instead, and that migration is a conversation we sit through with your team directly rather than a support ticket queue you get randomly routed into.

If the honest bottleneck in your practice right now is a lien deadline that is genuinely hard to track reliably given how tight the statutory window actually is, party relationships scattered across months of project correspondence with no clear structure, or a project's related disputes fragmented across disconnected files with no visible connection between them, that is exactly the gap Casely was built to close for a construction practice specifically. And if none of those are your actual bottleneck today, that is useful information too, the right move is testing the product against a real batch of your own active matters, not a feature list on its own.

It is also worth being honest about how much of your firm's current lien deadline tracking depends on one attorney doing the jurisdiction-specific calculation correctly every single time a payment dispute arises, versus how much lives in a documented, trackable system the whole team can verify independently before that tight window actually closes.

That distinction matters more in construction law than in almost any other practice area, because a lien deadline missed by even a single day can mean a client permanently loses leverage on a payment dispute worth hundreds of thousands of dollars, and no amount of skilled advocacy afterward can recover a right that expired on a calendar the firm was supposed to be watching closely.

Frequently asked questions

Yes. The deadline diary attaches specific dates to any matter with next-date auto-tracking, so a lien filing deadline, which can be measured in days rather than months in many jurisdictions, lives on the case file itself and surfaces on the relevant list well before it is due, rather than depending on memory during a busy project dispute.

Contact labels let staff tag exactly what role each party plays on a given matter, the owner, the general contractor, a specific subcontractor, the surety, so anyone opening the file can see instantly who is who and how to reach them, without digging through project correspondence to figure out the relationships.

Yes. A flat-fee contract review or drafting engagement can be billed as a single line item, while a payment dispute or defect litigation matter accrues time against the file the normal way and turns into an itemized invoice with one click, whichever model fits the specific matter.

man in green crew neck shirt and black hatshallow focus photo of woman in gray jacketshallow focus photography of woman outdoor during day

TRUSTED BY OVER 3K ATTORNEYS

get started

Coming soon — in the next 3 months

App Store
Google Play
a computer generated image of wavy shapes

Set up your firm in just 10 minutes